1951 South Western Railroad Railway Stock Certificate Macon Georgia- FREE BONUS

Category Coins & Paper Money Stocks & Bonds, Scripophily Transportation Railroads

Current price $4.00

Buy It Now price $5.39

Listing type Chinese

Location Atlanta, Georgia 30303 US

Quantity sold 0

Quantity available 1

Bids 0

Seller pmdghd (2630)

Seller rating 100% positive feedback

Modified Item No

See it on eBay →

YOU ARE BIDDING ON THE ACTUAL STOCK CERTIFICATE SHOWN IN THE PHOTOS.
_***THERE IS ALSO A FREE ***BONUS*** ITEM WITH THIS CERTIFICATE ----A CHECK DATED 1942 FROM THIS RAILWAY****_
THIS IS A CERTIFICATE FROM 1951 FROM THE SOUTH WESTERN RAILROAD RAILWAY OF GEORGIA. ON THE END IT SHOWS "REGISTERED CITIZENS & SOUTHERN NATIONAL BANK, MACON, GA"
ON THE REVERSE IT SHOWS THIS CERTIFICATE WAS TRANSFERRED TO THE CENTRAL OF GEORGIA (COFGA), RAILWAY COMPANY IN JULY, 1951. CENTRAL WAS BOUGHT BY SOUTHERN RAILWAY IN 1963, AND EVENTUALLY BECAME NORFOLK SOUTHERN CORPORATION.
WINNING BIDDER PAYS $3.99 POSTAGE/HANDLING. I DO NOT SHIP OUTSIDE THE 50 US STATES.
THE HISTORY OF THIS RAILROAD IS AS FOLLOWS:
One of Georgia’s oldest railroads, the Southwestern was chartered in 1845 to build a railroad from Macon through southwestern Georgia to the lower Chattahoochee River. Construction began around 1848 and proceeded slowly. By 1852, the rails had been laid from Macon only as far as the Flint River at Oglethorpe. The next year the line was extended to Americus, aided by a $75,000 investment by Americus citizens. In 1857, the Southwestern purchased the line between Americus and Albany then under construction by the Georgia and Florida Railroad and pushed it to completion. The latter company was consolidated into the Southwestern in late 1859.
At Fort Valley, a branch was built westward to meet the unfinished Muscogee Railroad, a 50-mile line begun in 1847 as a Columbus-to-Macon route. When the Muscogee faltered in 1853, the Southwestern stepped in to complete the connection to the Muscogee’s eastern end at Butler. The Muscogee was consolidated into the Southwestern in 1856.
At Smithville, about 12 miles south of Americus, the Southwestern built another branch that ran westward to Cuthbert. Three miles west of Cuthbert, the rails branched again with one line leading west to Eufaula and the other 19 miles southwest to Fort Gaines. Both segments were completed in 1860.
As was the case for most antebellum Southern railroads, much of the construction was done by slaves. In 1850, for example, the Southwestern was the third largest slaveholder in the state.
On June 24, 1869, the Southwestern was leased to the Central of Georgia. Under the Central lease the railroad continued to construct branch lines, adding Albany to Arlington (36 miles) in 1873, Fort Valley to Perry (12 miles) in 1875, Arlington to Blakely (13 miles) in 1881, and Blakely to Columbia (12 miles) in 1889.
For a number of years, the railroad's timetables were published under the heading "Central and South-western Railroads of Georgia." By the latter part of the 1880s, the "South-western" part had been de-emphasized, with the railroad being listed as a division within the Central's timetables.
In 1954, the Central of Georgia (CG) acquired a majority of the Southwestern’s stock and made the railroad an integral part of its own system. In 1963 the Central was purchased by Southern Railway. And in 1982 Southern Railway merged with Norfolk & Western Railway to become Norfolk Southern Corporation.

Also popular in the category Coins & Paper Money → Stocks & Bonds, Scripophily → Transportation → Railroads